Aluminum Pipe

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Beijing
Validity to: Long-term effective
Last update: 2017-09-18 02:13
Browse the number: 387
inquiry
Company Profile
 
 
Product details

Aluminum pipe

PRODUCT

   ALLOY  

TEMPER    

SURFACE TREATMENT

APPLICATION    

ALUMINUM PIPE     

6060

T3 T4 T5 T6 T651

Mill finish, Powder cioating,     Anodizing, Polishing, Electropholetic coating

Constructon, Decoration,    Industrial, Windows&doors, Balcony, Office etc

6061

6063

6065


Product Description

 Aluminum pipe

 

-Finishing: With any color, powder coating, anodize, electrophoresis, 
-Wall thickness: >1.2mm

-Super strong corrosion-resistant surfaces, effectively prevents the corrosion of acid, alkali and salt 
-The best choice for preventing corrosion of constructive ash slurry 
- Long life: It can endure more than 50 years' corrosion, aging, depigmentation and shelling under bad environments 
- Smooth and subtle, gorgeous and magnificent appearance 
-Packing: Foam and plastic, or paper interleave, sub-bundles 
- Approximately 8 - 12 metric tons/20' container 
-Approximately 10 - 25 metric tons/40' container 
-Delivery lead time: 10-25 days 
-Delivery method: Ocean containers 
-Length: Up to 12 m

-Application:Widely used in building,  architecture,  furniture, mine etc.



 

 

 

 

Company Information

 

Aluminum profile is one of the biggest catagory of our products, the workshops has production lines for aluminium bar casting, mould making and profile extrusion. It also possesses various types of extrusion equipments including several extrusion production lines which integrate various advanced surface treatment systems such as, chemical polishing, anodizing, electrophoretic coating, powder spraying and wood grain transfer. The company is able to produce various specifications, grades and special required aluminium profiles according to customers' needs with annual production capacity of 10,000 tons.

 

 

R&D

 

 

Packaging & Shipping

 

Plastic film or as cilents' required

 

 

 

FAQ

Cilent: how many meter can you supply in longest 

YONGHONG: 13 Meter


Cilents: how many days can finished the goods?

YONGHONG: For open new mould, around 45days. gerenal size: around 30days.


Cilents: how about the payment?

YONGHONG: normally, 30%T/T in advance  and the balance according the truth out weight before the shippment as FOB TERM or at the sight of BL as CFR TERM

Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]